Supported by Double-hundred Plan Project in Shenzhen City of Guangdong
[Objective] The reseamh aimed to study removal effects of the organic matter and N by box filler enhancing MBR process. [ Method] By adding box filler into reaction pool of the MBR to treat domestic sewage, removal ef...
Supported by Science and Technology Key Project of Water Pollution Control and Management(2008ZX07314-003)
[Objective] The aim was to study the influence factors of membrane fouling in A/O-MBR system,so as to control membrane fouling better,prolong the service life of membrane,further reduce the cost of water treatment and...