检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:宗瑞卿 赵春晓 靳小虎 ZONG Ruiqing;ZHAO Chunxiao;JIN Xiaohu(PowerChina Hebei Electric Power Engineering Co.,Ltd.,Shijiazhuang 050000,China)
机构地区:[1]中国电建集团河北省电力勘测设计研究院有限公司,河北石家庄050000
出 处:《武汉大学学报(工学版)》2022年第S01期121-126,共6页Engineering Journal of Wuhan University
摘 要:汽轮发电机是发电厂的核心设备,作为其支撑的基础在设计中应满足规范要求。近些年来随着“一带一路”建设的纵深推进,为我国电力行业带来诸多新的海外发展机遇,而ASCE标准条件下的汽轮发电机基础设计逐渐成为许多国外咨询的推崇。依托此背景详细论述了ASCE标准下汽轮发电机的设计全过程,为今后汽轮发电机基础的设计提供参考。The turbo generator is the core equipment of power plants.As the foundation of its support,it should meet the requirements of relevant codes in design.In recent years,with the deepening of“The Belt and Road”construction,many new overseas development opportunities have been brought to China’s electric power industry,and the basic design of turbo-generator under ASCE standard conditions has gradually become highly recommended by many foreign consultants.Based on practical engineering application,this paper discusses the whole design process of ASCE standard turbo-generator foundation in detail,providing a reference for the design of ASCE standard turbo-generator foundation in the future.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.239