检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:叶梅新[1] 陶路[1] 罗如登[1] 莫朝庆[1]
出 处:《中国西部科技》2007年第12期1-4,共4页Science and Technology of West China
摘 要:本文以跨浅海水道连续桥为研究时象,采用质量弹簧体系模拟基础和地基,用有限元通用软件分别建立了该桥的考虑桩-土-结构作用的全桩模型、将基岩中桩截去且考虑桩-土-结构相互作用的截桩模型和不考虑桩-土相互作用的无桩三维有限元模型。以此为基础,对该桥进行三维地震动态时程分析,分析了桩-土-结构相互作用对该桥动力特性的影响和不同地震动输入下桩-土-结构相互作用对该桥位移反应、内力反应等地震响应的影响。This paper studies continuous bridge spanning shallow sea channel.The mass-spring system was used to simulate foundation and subgrade;the finite element common software was used to build the whole-pile model considering pile-soil-structure interaction,the incomplete-pile model considering pile-soil-structure interaction with cutting out the pile in the original rock,the three-dimensional finite element model without considering pile-soil interaction.It also studies three-dimensional earthquake dynamic time history analysis,and analyses the influence of pile- soil-structure interaction on the dynamic property,the influence of pile-soil-structure interaction at different earthquake simulation on the reflection of displacement and internal force.
关 键 词:桩-土-结构相互作用 连续梁桥 地震反应分析 时程分析
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222