检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:郑宜枫[1]
出 处:《地下空间与工程学报》2007年第z1期1349-1353,共5页Chinese Journal of Underground Space and Engineering
摘 要:结合中国第一条双圆隧道工程施工,对双圆隧道盾构推进对周围环境影响的现场监测方法进行了论述。文章以双圆盾构隧道区间施工为实例给出了双圆盾构推进过程中周围土体的变形、土压力、水压力变化的监测方法与测点布置方案,据此监测方案,可以详细监测与分析盾构推进过程中周围土体的地表变形、深层土体变形及土体中的土压力、水压力的变化,从而揭示盾构推进对周围的土体环境的扰动影响规律。This article presents an on-site testing of the construction site surroundings during construction of a Double-O-Tube(DOT)tunnel.During the process of the first DOT tunnel construction in China,Shanghai Tun- nel Engineering Co.,Ltd.undertook detailed monitoring analyses on the construction site surroundings in the proce- durcs of tunnel construction such as surface settlement,deep soil deformation,inclination of strata,water pressure and soil pressure etc.Accordingly much were obtained of first-hand monitoring data,which are very useful to under- stand in depth the characteristics of the soil in DOT tunnel construction.At the same time,this work builds up ample information resources for further exploration of DOT tunnel construction.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.112