检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《武汉理工大学学报》2008年第4期91-94,共4页Journal of Wuhan University of Technology
基 金:国家自然科学基金(50278004)
摘 要:采用非线性时变有限元法,对索穹顶结构在各施工阶段的力学性状进行了全过程跟踪分析,得出施工过程杆件内力和节点位移的演变规律。计算结果表明,部分杆件在施工过程中的最大内力超出设计值的47%,得出不考虑施工过程的时变效应对结构设计偏于不安全的结论,最后为索穹顶结构的设计和施工提出指导性的建议。The structural characteristics in every construction stage of cable dome were analyzed.Adopting the theory of nonlinear time-varying mechanics,the variations of internal force and displacements were obtained.Numerical results indicated that maximum internal force in construction process was greater 47% than that in designed state,the paper reached a conclusion that it was not safe to design if the time varying effect was not considered in the construction process analysis.At last,advices on design and const...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222