检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:胡钊芳[1]
机构地区:[1]华东交通大学
出 处:《公路交通科技》2006年第S1期127-129,共3页Journal of Highway and Transportation Research and Development
摘 要:对梨温高速公路进贤连接线跨浙赣铁路立交桥1号桥墩下沉的原因从技术的角度进行了分析,并介绍了处治设计方案的比选及施工要点。Friction pile gets friction from the undisturbed soil around it to brace its own weight and the loads from superstructure.The No.1 pier grade separation bridge and Jinxian connecting Liwen freeway and Jinxian over Zhegan railway is designed as a friction pile.According to the alteation work,the undisturbed soil around it was excavated with excavating machine.The pile sinded during construction.The causes of the sinking are analyzed from theory and technology,processing design scheme and the choice are intro...
分 类 号:U445.7[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145