检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:赵建峰[1]
出 处:《铁道工程学报》2005年第z1期364-368,共5页Journal of Railway Engineering Society
摘 要:采空区不良地质问题影响铁路工程地质选线和运营安全,并且规模越来越大。通过几十年来铁路工程积累的经验,提出不同等级的铁路适应地表和岩层变形的能力不一样,塌陷角的选择和保护煤柱的宽度也不同,高速铁路应该留设更宽的安全煤柱。The unfavorable geological condition threatened the railway safety and rail track selection and the size of gob was more and more bigger.Through many years of experience in railway engineering,it is realized that the adaptability for ground surface and terrane deformation was different for different grade railway.Be- sides,the selection of collapse angle and the width of protection coal wedge were also different.The broader coaX wedge should be retained for high-speed railway.
分 类 号:U213[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.200