检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《铁道工程学报》2005年第z1期440-447,共8页Journal of Railway Engineering Society
摘 要:本文介绍了施工地质超前预报的主要内容和采用的6种主要技术方法。分析探讨了地球物理方法的进展,重点评述了隧道地质预报研究及取得的主要成果。通过实践,工程地质界、隧道工程界共同认识到,成功的预测预报技术应是以地质法为基础、以多种地球物理探测方法为手段的隧道综合地质超前预报技术。This paper introduced the main content and six used technical methods of construction geology pre- diction.The analysis has discussed the geophysics method progress,narrated and commented the main a- chievement with emphasis which the tunnel geology prediction studies and obtains.By practice,the engineer- ing geology industry and the tunnel engineering industry realized successfully tunnel synthesis geology fore- cast technology should be take the geological method as a foundation,take the many kinds of geophysics ex- ploration method as a measure.
分 类 号:U456.3[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.38