岩石高边坡爆破开挖对锚固设施的影响  被引量:17

Influence of Rock High Slope Explosive Excavation on Anchored Installations

在线阅读下载全文

作  者:陆遐龄[1] 

机构地区:[1]中国水利水电科学研究院,北京市100044

出  处:《爆破》2000年第S1期147-151,共5页Blasting

摘  要:本文根据在黄河李家峡工程施工中开展的现场试验 ,就岩石高边坡开挖时 ,爆破动荷载对已设置的边坡预应力锚杆锚索 (及锚筋桩 )等锚固设施的影响进行了研究。采用多种测试方法 ,如加速度、动应变、动应力等追踪了爆破动荷载对它们的作用过程及其影响 ,分析了其瞬时增荷及预应力受损的危害 ,并据此核算了典型滑动面的稳定性 ,本文将着重介绍对预应力锚杆锚索的加速度测试分析研究。On the basis of field tests in the Yellow River Lijiaxia project, the influence of dynanic explosive load on the reinforced anchored installations such as anchor piles and anchorage cables is investigated. Various testing methods such as acccleration, dynamic strains and dynanic stress are used to trace the process and inflnence of dynamic explosive load on the factors are utilized. The impair of reinforced stress by instantaneous loading is analyzed. Then the stability of typical slip surgace is calculated...

关 键 词:锚固设施 爆破开挖 高边坡 

分 类 号:TV542[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象