孟加拉卡纳普里三桥主桥施工  被引量:4

Construction of Main Bridge of the 3rd Karnaphuli Bridge in Bangladesh

在线阅读下载全文

作  者:余本俊[1] 谢红兵[1] 

机构地区:[1]中铁大桥局集团有限公司,湖北武汉430050

出  处:《世界桥梁》2010年第2期1-4,19,共5页World Bridges

摘  要:孟加拉卡纳普里三桥主桥为四塔五跨预应力混凝土单索面部分斜拉桥,针对该桥地址、水文及200 m主跨设4根桩,24 m宽单箱梁等结构特点,施工中采取相应技术措施,如基础施工中对钻孔桩上端的钢筋密集段采取二次干浇的方法;上部结构施工中钢绞线临时固结墩梁施工大跨度连续梁方案、大吨位斜拉索多批次张拉等,经过约2年建设工期,大桥顺利合龙。The main bridge of the 3rd Karnaphuli Bridge in Bangladesh is a 5-span prestressed concrete extradosed bridge with 4 pylons and a single cable plane.In the light of the geologic andhydrologic conditions at the bridge site and also the structural characteristics of the bridge that 4 bored piles were arranged for each pier of the 200-m main spans and the single box girder was 24 m wide,the corresponding technical measures were taken in the construction.The measures that were taken mainly included the two-time...

关 键 词:部分斜拉桥 基础 上部结构 桥梁施工 

分 类 号:U448.27[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象