哈大铁路客运专线新开河大桥138m钢箱叠拱过运架设备施工检算  被引量:5

Inspection and Calculation of 138 m Steel Box Superimposed Arch Bridge over Xinkai River on Harbin-Dalian Passenger Dedicated Line

在线阅读下载全文

作  者:杨正华[1] 

机构地区:[1]中铁第一勘察设计院集团有限公司桥隧处,西安710043

出  处:《铁道标准设计》2012年第5期93-95,共3页Railway Standard Design

摘  要:结合哈大客运专线1-138 m钢箱叠拱桥施工方案的设计,运用Midas有限元计算软件,分析运梁车过梁和架桥机架设箱梁过程中临时桥面系、桥面板的受力特点,为最终施工方案的制定提供依据,计算表明施工方案切实可行。With reference to the design of construction program for 138 m steel box superimposed arch bridge on Harbin-Dalian Passenger Dedicated Line and the application of Midas finite element calculation software,this paper analyzes the stress conditions of the temporary bridge decking and the deck slab when the transport vehicle is getting across the bridge and box girder is being erected,which may serve as references to determine the final construction scheme.Calculations have justified the feasibility of the construction scheme.

关 键 词:哈大客运专线 钢箱叠拱桥 运架设备 施工检算 

分 类 号:U238[交通运输工程—道路与铁道工程] U445[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象