牵引变电所“手拉手”电源在大包铁路电化改造工程的应用  被引量:2

Application of "Hand in Hand" Power Supply Mode of Traction Substation in Electrification Renovation Project of Datong-Baotou Railway

在线阅读下载全文

作  者:丁宇坤[1] 宇占军 胡长春 

机构地区:[1]呼和浩特铁路局建设管理处,呼和浩特010030 [2]呼和浩特铁路局供电处,呼和浩特010053 [3]呼铁局大包电气化改造工程指挥部,呼和浩特010050

出  处:《铁道标准设计》2012年第11期98-100,共7页Railway Standard Design

摘  要:主要介绍在大包线电气化改造工程中,地方电力资源不具备两路220 kV独立电源引入牵引变电所的情况下采用"手拉手"电源供电方式,对"手拉手"电源供电方式在经济性和可靠性两个方面的优越性进行论证,该种形式的电源供电方式具有结构简单、投资省、可靠性高等优点,是外部电源稀缺的情况下对牵引变电所实现两路电源供电的理想方法。In the electrification renovation project of Datong-Baotou Railway,the 'hand in hand' power supply mode was adopted because the local power sources didn't have two 220kV independent power supplies which should access to the traction substation.In this paper,the superiorities on the economic efficiency and reliability of 'hand in hand' power supply mode are demonstrated.The paper thinks that: there are many advantages in this kind of power supply mode,such as simple structure,low investment and high reliability.So it is the ideal way to achieve two-way power supplies for the traction substation in the case of the scarcity of external power sources.

关 键 词:电气化铁路 牵引变电所 手拉手 电源供电 

分 类 号:U224[交通运输工程—道路与铁道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象