检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张全民[1]
出 处:《广东土木与建筑》2013年第12期27-29,57,共4页Guangdong Architecture Civil Engineering
摘 要:很多设计规则的钢结构工程,由于受施工场地所限,大型吊机难以移动,常规吊装较难实施。为了既能加快进度,又能解决吊装死角问题,可以选择采用定点吊装、定向滑移、高空焊接、整体同步卸载的方法。目前我司承接滑移的两个项目均克服了以上难题,取得了很好的经济和社会效益,在此做一探讨及推广。Many steel structure engineering design rules,due to the construction site constraints,difficult to move a large crane,lifting routine more difficult to implement. In order both to accelerate progress,but also solve the problem of lifting dead,you can choose to use fixed-point lifting,directed slip,high-altitude welding,unloading overall synchronization methods. My unit currently consists of two projects are slipping overcome the above problems,and achieved good economic and social benefits,in order to explore and popularize this done.
分 类 号:TU758.11[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222