检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]Department of Bridge Engineering,Tongji University,Shanghai 200092,China
出 处:《Science China(Technological Sciences)》2009年第12期3626-3631,共6页中国科学(技术科学英文版)
基 金:Supported by the National Natural Science Foundation of China(Grant No.50408037);the Shanghai Pujiang Program(Grant No.09PJ1409500)
摘 要:This paper presents a method to identify risk factors during bridge construction.The method integrates the concepts of analytical hierarchy process and fuzzy consistent matrix method.The advantage of the method is that instead of using 9-point scale of relative importance of the conventional analytical hierarchy process,it uses a 3-point scale to describe the scale of importance,thus greatly simplifying the identification problem of risk factors.Moreover,the difficulties of making judgment and comparison caused by uncertainty that jeopardizes the accuracy of the results in the conventional analytical hierarchy process can also be overcome.Another advantage of the method is that it does not involve consistency checking,thus saving a large amount of CPU time.It has been demonstrated with a numerical example that the proposed fuzzy analytical hierarchy process based on 3-point scale can offer significant computational savings over the conventional analytical hierarchy process.This paper presents a method to identify risk factors during bridge construction. The method integrates the concepts of analytical hierarchy process and fuzzy consistent matrix method. The advantage of the method is that instead of using 9-point scale of relative importance of the conventional analytical hierarchy process, it uses a 3-point scale to describe the scale of importance, thus greatly simplifying the identification problem of risk factors. Moreover, the difficulties of making judgment and comparison caused by uncertainty that jeopardizes the accuracy of the results in the conventional analytical hierarchy process can also be overcome. Another advantage of the method is that it does not involve consistency checking, thus saving a large amount of CPU time. It has been demonstrated with a numerical example that the proposed fuzzy analytical hierarchy process based on 3-point scale can offer significant computational savings over the conventional analytical hierarchy process.
关 键 词:ANALYTICAL HIERARCHY process risk fuzzy CONSISTENT MATRIX IDENTIFICATION
分 类 号:U441[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.71