出 处:《Science China(Technological Sciences)》2011年第S1期40-46,共7页中国科学(技术科学英文版)
基 金:supported by the National Natural Science Foundation of China(Grant No.50539120);the Foundation for Innovative Research Groups of the National Natural Science Foundation of China(Grant No. 51021004);the National Natural Science Foundation of China(Grant No.90815019)
摘 要:Temperature control,which is directly responsible for the project quality and progress,plays an important role in high arch dam construction.How to discover the rules from a large amount of temperature control information collected in order to guide the adjustment of temperature control measures to prevent cracks on site is the key scientific problem.In this paper,a mathematic logical model was built firstly by means of a coupling analysis of temperature control system decomposition and coordination for high arch dam.Then,an analysis method for temperature control information was presented based on data mining technology.Furthermore,the data warehouse of temperature control was designed,and the artificial neural network forecasting model for the highest temperature of concrete was also developed.Finally,these methods were applied to a practical project. The result showed that the efficiency and precision of temperature control was improved,and rationality and scientificity of management and decision-making were strengthened.All of these researches provided an advanced analysis method for temperature control in the high arch dam construction process.Temperature control,which is directly responsible for the project quality and progress,plays an important role in high arch dam construction.How to discover the rules from a large amount of temperature control information collected in order to guide the adjustment of temperature control measures to prevent cracks on site is the key scientific problem.In this paper,a mathematic logical model was built firstly by means of a coupling analysis of temperature control system decomposition and coordination for high arch dam.Then,an analysis method for temperature control information was presented based on data mining technology.Furthermore,the data warehouse of temperature control was designed,and the artificial neural network forecasting model for the highest temperature of concrete was also developed.Finally,these methods were applied to a practical project. The result showed that the efficiency and precision of temperature control was improved,and rationality and scientificity of management and decision-making were strengthened.All of these researches provided an advanced analysis method for temperature control in the high arch dam construction process.
关 键 词:high ARCH DAM construction temperature control information DATA MINING DATA WAREHOUSE NEURAL network model
分 类 号:TV544[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...