济钢新上工程预结算审查中的问题  

Problems of Engineering Budget and Settlement Examination in New Project at Jigang

在线阅读下载全文

作  者:赵青[1] 刘熠[1] 

机构地区:[1]济南钢铁集团总公司,山东济南250101

出  处:《山东冶金》2003年第S1期47-48,共2页Shandong Metallurgy

摘  要:工程预、结算审查一般是通过套用预算定额的方法来确定其工程造价 ,但随着经济的进步以及建筑市场的发展 ,仅套用现有的定额有一定的局限性并影响工程造价的准确性。针对预结算审查中常见的特殊工程无合适定额子目和常规工程中定额子目缺项的问题 ,分别采取对近似定额子目进行换算和补充相应定额子目的方法给予解决 ,使造价更趋合理。The examination of engineering budget and settlement (EEBS) is general to mechanically apply budget ration to confirm the cost of the engineering project. With the development of economy and construction market, using mechanically budget ration should have a definite localization and influence the accuracy of engineering cost. For the problems occurred in EEBS that no suitable ration subdirectories in the special engineering and lack of ration subdirectories in the regular engineering, the solvent are to change the approximate ration subdirectories and supplement the relative ration subdirectories and make the cost more suitable.

关 键 词:工程预算 工程结算 审查 定额 子目 

分 类 号:TU723.3[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象