连续刚构桥后期挠度过大影响因素的偏差分析  被引量:5

Deviation Analysis on Large Deflection of Continuous Rigid Frame Bridge's in Post-Construction

在线阅读下载全文

作  者:李庆桐[1] 周志祥[1] 刘小渝[1] 

机构地区:[1]重庆交通大学土木建筑学院,重庆400074

出  处:《重庆交通大学学报(自然科学版)》2013年第S1期818-822,共5页Journal of Chongqing Jiaotong University(Natural Science)

摘  要:基于目前国内外大跨径连续刚构桥出现主跨跨中挠度过大的窘态和危害,介绍了设计、施工、设计与施工等3类偏差,从3类偏差的角度讨论了连续刚构桥主跨跨中挠度过大的原因,并提出相应的对策,可以为连续刚构桥的设计和施工提供参考。Based on the domestic and foreign long-span continuous rigid frame bridge with the emergence of embarrassment and harm of the large deflection of mid-span currently,three kinds of deviation were introduced,such as design deviation,construction deviation,as well as deviation between design and construction.Then from the point of three kinds of deviation,the causes for large deflection of continuous rigid frame bridge's mid-span were discussed,and the corresponding countermeasures were also put forward,which can provide some references for the design and construction of continuous rigid frame bridge.

关 键 词:连续刚构桥 跨中挠度过大 设计偏差 施工偏差 设计与施工偏差 

分 类 号:U448.23[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象