检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:梁仲元
机构地区:[1]广州地铁总公司
出 处:《建筑技术》2004年第7期488-491,共4页Architecture Technology
摘 要:广州地铁一、二号线地下车站的结构防水设计采用分离式结构、复合式结构、叠合墙结构、单一墙结构、矿山法暗挖车站5种,其中前两种防水效果较好;地下区间隧道的结构防水设计类型主要有明挖法、盾构法和矿山法,其中矿山法暗挖隧道的防水效果普遍不理想,主要原因是施工工艺存在弊端。In the structural waterproof design for underground stations of Guangzhou Subway Lines 1 & 2, five types of structure are adopted, namely, separate structure, composite structure, single wall structure and structure constructed by concealed mineral excavation, among which the first two are of good waterproofing effect. Structural waterproof design for underground tunnel sections is mainly divided into open excavation method, shield construction method and mine method, while the waterproofing effect of the latter one is unsatisfying in general, mainly due to the defects of construction technology.
分 类 号:TU921[建筑科学—建筑设计及理论]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.33