检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]河海大学水利水电工程学院,江苏南京210098 [2]广东省水利水电科学研究院,广东广州510610 [3]飞来峡水利枢纽建设管理局,广东清远511825
出 处:《水利水电技术》2004年第10期53-55,共3页Water Resources and Hydropower Engineering
摘 要: 通过对飞来峡大坝的水平位移进行分析,建立相应的统计模型,并通过统计模型与BP神经网络模型进行比较,建立相应的预报模型,为飞来峡大坝的安全监测提供依据.通过分析比较得到结论:飞来峡大坝目前变形性态正常,水平位移年变幅主要受温度荷载的影响,BP神经网络模型虽然拟合精度较统计模型高,但是其预测能力并不优于统计模型,而且统计模型能对监测数据作分解和成因解释,所以采用统计模型对飞来峡大坝建立了预测模型.The horizontal deformation of Feilaixia Dam was analyzedin this paper. Then the statistical model was developed, and through a comparison between statistical model and BP neural network model, the corresponding forecast model was given, which is the safety monitoring guide of Feilaixia Dam. According to above analysis, some results obtained: the deformation of Feilaixia Dam is normal. The thermal load is the main load to the deformation range of horizontal deformation. Though the regress precisionof BP neural network model was higher than the statistical model, the forecast precision of the former was not better than the latter, and the latter is suitable for analyzing and explaining the obtained monitoring data, the forecast model of the Feilaixia Dam was developed by statistical model.
关 键 词:飞来峡大坝 水平位移 统计模型 BP模型 预测模型
分 类 号:TV698.1[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.222.30.59