检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:潘旭亮[1] 张钦喜[1] 霍达[1] 杨立刚[1]
出 处:《工业建筑》2004年第9期8-11,共4页Industrial Construction
摘 要:利用国际通用岩土工程分析软件FLAC ,通过数值模拟的方法研究了双排桩在分步开挖情况下的力学响应 ,从双排桩排距及桩的嵌入深度两个方面 ,对双排桩围护结构的工作特性进行了分析讨论。研究表明 :当排距s<4d(d为桩直径 )时 ,门架空间效应差 ;s >8d时 ,门架空间效应也差 ,联系梁起拉杆作用 ,前后排桩距的合理范围为 4d~ 8d。随嵌入深度加大 ,桩的位移减小 ,但同时桩的内力增大。The mechanical response of double row pile under step excavation is studied through numerical simulation and using general international geotechnical analytic software FLAC;and the working characteristics of the double- row pile retaining system are discussed according to the distance between two rows and the insertion depth of a pile.The study shows that the space effect of a portal frame will be poor if the distance between two rows,s<4d(d is the diameter of the pile).When s> the space effect of the portal frame is also poor with a tie beam acting as a tie bar.The rational range of the distance between two rows is 4d~8d.The displacement of a pile is decreased and its internal force is increased with increasing the insertion depth of the pile.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28