SMW围护墙防渗控制技术  被引量:3

Seepage control technique for soil-cement mixed walls

在线阅读下载全文

作  者:周希圣[1] 英旭[1] 

机构地区:[1]上海隧道工程股份有限公司,上海200045

出  处:《水利水电科技进展》2004年第5期45-47,共3页Advances in Science and Technology of Water Resources

摘  要:针对超深基坑(挖深超过15m的基坑)由于受地压、土性、设备性能、施工控制技术等影响而导致围护结构防渗控制相对较难的情况,以南京地铁1号线珠江路车站工程为背景,基于对超深基坑SMW围护结构渗水原因的分析,从理论上对防渗墙的厚度及墙体的变形进行设计计算,并从施工的角度对防渗控制技术进行了探讨.In consideration of some affecting factors, such as the earth pressure, soil characteristics, equipment performance, and construction control techniques, it is relatively difficult to control seepage through curb walls with ultra-deep foundation pits (the depth being over 15m) during the construction period. Based on an analysis of the causes of seepage through the curb wall structure, the thickness and deformation of the impervious wall were determined for the design of the Zhujiang Road Station in the Nanjing metro project, and the seepage control technique was also discussed from the angle of construction.

关 键 词:SMW工法 水泥土搅拌桩 防渗技术 

分 类 号:U231.4[交通运输工程—道路与铁道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象