基于时间竞争的MRPⅡ、JIT与TOC集成化生产管理模式  被引量:5

Integrated Production Management Model of MPRⅡ, JIT and TOC in Time-based Competition

在线阅读下载全文

作  者:陈建华[1] 彭鸿广[2] 

机构地区:[1]华中科技大学管理学院,湖北武汉430074 [2]浙江科技学院经济管理系,浙江杭州310012

出  处:《工业工程与管理》2004年第6期75-79,共5页Industrial Engineering and Management

基  金:国家自然科学基金资助重点项目(70332001)

摘  要:从MRPⅡ、JIT与TOC的基本思想出发,提出了三者集成的基本思路,构建了基于TOC的以MRPⅡ生产计划系统为主导的"Push"体系和以JIT生产控制系统为主导的"Pull"体系相结合的集成化生产计划与控制模型。该模型以追求瓶颈资源能力的最大利用为出发点,根据市场需求预测和JIT生产拉动进行生产计划的动态优化调整,同时利用采购计划和供应商能力计划及看板系统对生产过程实施双重控制。An integrated idea was presented from the basic point of MRPⅡ, JIT and TOC. An integrated production planning & controlling model was proposed, which integrated a push production planning system dominated by the MRPⅡ and a pull production controlling system dominated by the JIT based on the TOC. Aiming at getting maximal utility of bottleneck resources, this model can be applied to optimize adjustment for the production plan dynamically according to demand forecasting of the market and pulling of JIT producing, actualizes double control in producing process in terms of outsourcing procurement plan, supplier's ability, and Kanban system.

关 键 词:基于时间的竞争 MRPⅡ JIT TOC 集成化 生产管理模式 

分 类 号:F274[经济管理—企业管理]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象