检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国兵器工业第58研究所自动化工程部,四川绵阳621000
出 处:《兵工自动化》2005年第1期16-16,19,共2页Ordnance Industry Automation
摘 要:柔性制造系统(FMS)的数控单元层调度,按先到先加工、最短时间规划(STP)和最小松弛度(LLD)生产调度原则对计划进行排序。通过工艺信息获得完成该条计划的资源和设备类型,计算该型设备的现有负荷,将计划指定到负荷最小设备上。每增加一条计划要重新计算设备负荷,直到安排完所有设备的月执行计划止。For scheduling of CNC (computer numerical control) cell layer for flexible manufacturing system (FMS), the sequence of production-plan is ordered according to some of scheduling rules such as first manufacturing, shortest time programming (STP), least laxation degree (LLD). The resource and machine types for the plan was gotten through the process information, and the existing load of the machine type was computed, the production-plan was assigned to the machine whose load is the lowest. It’s necessary for added a plan to compute the machine load over again, until the plans on all machine are ordered.
关 键 词:数控单元调度 柔性制造系统 最短时间规划 最小松弛度
分 类 号:TH186[机械工程—机械制造及自动化] TH165
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.22