检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]河海大学海岸及海洋工程研究所,江苏南京210098
出 处:《海洋通报》2005年第1期56-61,共6页Marine Science Bulletin
摘 要:建立了深圳河非恒定流数学模型,模型中考虑了过闸水头突变的计算方法,采用拉格朗日法研究深圳河上游的罗芳污水处理厂和滨河污水处理厂所排出污水沿深圳河的运动过程,计算分析了利用潮汐动力减轻深圳河污染的水力条件。结果表明,深圳河口建闸 种不同调控方案下污水运移至深圳河口的总时 3间有所增加,这对于减轻深圳河的污染情况不利;从大鹏湾抽调清水以增加上游来水量则会大大缩短污水运移至深圳河口的时间,从而减轻深圳河的污染状况。A one-dimensional numerical model of non-steady tidal flow motion in the Shenzhen River was established, in which the change of water head through the waterlocks was taken into account to study the effects of two engineering measures to mitigate pollutions in the Shenzhen River. The first engineering measure was to construct the waterlocks nearby the Shenzhen River mouth, and the other one was to transfer the water from the Dapeng Bay to the upstream of the Shenzhen River. The Lagranrine tracing method was used to study the moving path of the sewage water particle from the Luofang sewage treating plant and the Binhe sewage treating plant, and to analyze the hydraulic conditions to mitigate the pollution in the Shenzhen River. It was found that the time of the sewage water particle moving to the Shenzhen River mouth would increase for the first engineering measure, indicating that it was useless to mitigate pollution; contrarily, the moving time of the sewage water particle would decrease remarkably for the second engineering measure, indicating that it was useful to mitigate pollution.
分 类 号:TV133[水利工程—水力学及河流动力学] X522[环境科学与工程—环境工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222