水电站过渡过程程序可视化设计的思路及实现  被引量:1

Visual Design Idea and Realization in Hydropower Transient Flow Program

在线阅读下载全文

作  者:杨建东[1] 莫剑[1] 唐岳灏[1] 赵桂连[2] 

机构地区:[1]武汉大学水利水电学院,湖北武汉430072 [2]国家电力公司成都勘测设计研究院,四川成都610072

出  处:《水电能源科学》2005年第1期57-59,共3页Water Resources and Power

基  金:国家电力公司基金项目 (SP1 1 -2 0 0 2 -0 3 -48-0 1)

摘  要:针对水电站过渡过程计算和水电站引水发电系统布置的实际情况 ,利用面向对象方法 ,实现对水电站引水发电系统的图形化模拟 ,实现自动建立实体间的拓扑关系 。According to the character of the water diversion system and hydropower transient flow program, a new program was developed by using object-oriented method and database is used for storing attribute data. In this method, a basic class is designed for all visualization object class , in this class a database pointer is encapsulated,so it can keep graph and database consistent. In this software, a new thoughts-dynamic coding method is put forward, which finally realizes the automatically analyzing codes method in graphical system of transient flow calculation program.

关 键 词:可视化程序设计 面向对象方法 动态编号方法 数据库无缝连接 

分 类 号:TV731[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象