浅埋地下通道地表沉降原因分析  被引量:2

Analysis of the ground surface settlement induced by the construction of a shallow underground passage

在线阅读下载全文

作  者:董新平[1] 周顺华[1] 高万春[2] 肖红渠[2] 

机构地区:[1]同济大学道路与交通工程教育部重点实验室,上海200331 [2]中铁隧道集团,洛阳471009

出  处:《现代隧道技术》2005年第1期68-70,76,共4页Modern Tunnelling Technology

摘  要:结合深圳某过街通道,对CD法施工所引起的地表沉降的主要因素进行了分析,指出CD法施工中浅埋地下通道地表沉降主要是由开挖阶段的初期支护整体下沉和中隔墙拆除阶段的结构变形所组成,并探讨和分析了地层变位的控制措施。Based on the measured data of an underground passage in ShenZhen city, the causes of ground surface settlements induced by the construction of the passage in which the CD construction method was adopted are analyzed. In the construction process by using CD method, the ground surface settlements are caused by the support subsidence in the process of excavation and support deformation in the process of removing the central diaphragm. The measures to control the ground surface settlements are also analyzed.

关 键 词:地下通道 地表沉降 控制措施 

分 类 号:U457.2[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象