广元城区河段裁弯工程对通航条件的影响  

River model study of sailing condition of the cut-off works scheme for Guangyuan reach of Jialinjiang river

在线阅读下载全文

作  者:赵志舟[1] 邓桂香[1] 周华君[1] 谢远华[1] 

机构地区:[1]重庆交通学院河海学院,重庆400074

出  处:《重庆交通学院学报》2005年第5期130-134,共5页Journal of Chongqing Jiaotong University

摘  要:嘉陵江广元城区河段为多个连续弯道组成的复杂河湾,弯道阻力大,行洪能力弱,导致广元城区洪灾频繁,损失十分严重.为了提高广元市城区河段的防洪能力,拟实施嘉陵江塔山湾河段裁弯综合治理工程,但工程对河势和航运的影响较大.本文通过河工模型试验,主要从通航角度对单一裁弯方案、双河并存裁弯方案的布置与整治效果进行了分析比较,双河并存方案老河槽内通航条件较好、对河势的影响相对较小,选择其为推荐实施方案.The GuangYuan reach of Jialinjiang River form with continuous curved section.The Periodical flood didn’t pass unimpeded,cause huge lose of the people aside the reach. For raising the city’s ability of the flood-control ,the multi-purpose regulations scheme are investigated on the basis of measured date in river model test. The project alternative divide to two kinds, i.e. unitary shortend section of river,and two chanel to coexist. Flood-control of the river, navigation and evolution of the river are analyzed. A reasonable and feasible project alternative and the improvement measurement are proposed.

关 键 词:裁弯工程 通航 防洪 

分 类 号:U612.16[交通运输工程—船舶及航道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象