建筑群下软~流塑地层隧道施工地表沉降控制分析  被引量:6

The Analysis on Ground Surface Settlement Control of Subway Tunneling under Buildings Region in Soft-flow Plasticity Strata

在线阅读下载全文

作  者:李文江[1] 刘志春[1] 朱永全[1] 

机构地区:[1]石家庄铁道学院土木工程分院,石家庄050043

出  处:《铁道标准设计》2005年第6期84-86,110,共4页Railway Standard Design

摘  要:从南京地铁珠-鼓区间软~流塑地层隧道具体工程出发,根据既有地面建筑物基础允许变形的规范要求,建立了施工地表沉降控制基准,同时对隧道施工进行了动态模拟计算和分析,并通过施工现场监测结果,对所获得的成果进行了验证.Based on the construction of subway tunnel and permissible displacement of buildings by according to the correlative specifications, a method is put forward to establishing ground surface settlement controlling criterion for shallow buried tunnels in soft-flow plasticity strata between Zhu\|Gu in Nanjing. By numerical calculation, the ground surface settlement changing during the excavating is discussed. And the results are validated by field measurement.

关 键 词:地铁隧道 软土隧道 建筑基础 地表沉降 施工效应 

分 类 号:U455[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象