实验室质量管理体系内部审核的实施  被引量:1

Implementation of Internal Audit of Quality Management System of Laboratories

在线阅读下载全文

作  者:张仁泉[1] 

机构地区:[1]苏州市环境监测中心站,江苏苏州215004

出  处:《污染防治技术》2005年第2期15-17,34,共4页Pollution Control Technology

摘  要:在实施ISO/IEC 17025:1999标准《检测和校准实验室能力的通用要求》过程中,通过实验室质量管理体系内部审核的实践与系统分析,识别出内部审核实施阶段的关键环节,提出召开首次会议、收集审核证据、确定审核发现和召开末次会议的技术方法,对提高内部审核的质量和有效性、获得可靠的审核结论具有重要意义。In the process of conducting the standard ISO/IEC 17025:1999 general requirements for the competence of testing and calibration laboratories,key links of implementation stage of internal audit of quality management system of laboratories has been identified by practice and systematical analysis,technical methods put forward for holding an opening meeting,collecting audit evidence,determining audit findings and holding an closing meeting,which is significant to improve quality and effectiveness of internal audit and reach reliable audit conclusions.

关 键 词:质量管理体系 内部审核 ISO/IEC17025 实验室能力 通用要求 系统分析 关键环节 实施阶段 技术方法 会议 核发 

分 类 号:F273.2[经济管理—企业管理] F203[经济管理—国民经济]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象