钢筋混凝土烟囱自升井架提模施工  

The self climbing shaft lift form construction of a R.C.chimney project

在线阅读下载全文

作  者:梁健 刘德仁 

机构地区:[1]太原市第一建筑公司

出  处:《建筑技术》1995年第7期394-396,共3页Architecture Technology

摘  要:汾河矿务局80m高钢筋混凝土烟囱施工中,由于缺乏滑模设备,施工单位利用液压提升原理,用倒链代替千斤顶提升井架及模板,节省了大量千斤顶及支承杆。本文详细介绍了这种可以降低造价、提高工效、保证质量的施工工艺。During the construction of an 80m high R.C.chimney project of the Fenhe Mine Administration,there was lacking of sliding formwork equipment.The contractor had applied the hydro-lifting theoryand made use of the chain block to substitute the jack for shaft form lifting.As a resulf,a great number ofjacks and scaffold poles were saved.In this article,a detailed description of this technology had been providedand proved that it could save the cost,promote the efficiency and guarantee a fine quality construction.

关 键 词:烟囱 钢筋混凝土 自升井架 提模 滑模 施工 

分 类 号:TU761.2[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象