盾构法隧道工程施工的定向测量  被引量:2

Directional Survey Technology of Shield-driven Tunneling Technique for Yangtze River Pipeline Crossing of West-to-East Gas Transmission Pipeline Project

在线阅读下载全文

作  者:高颖涛[1] 曹会清[1] 

机构地区:[1]中国石油天然气管道局管道第四工程公司

出  处:《油气储运》2005年第9期31-33,共3页Oil & Gas Storage and Transportation

摘  要:介绍了在红花套长江穿越盾构隧道施工中所采用的泥水加压平衡式盾构法施工工艺。针对盾构法施工的特点,进行了测量贯通误差分析,通过对各种测量方案的比选,提出了采用联系三角形定向测量法进行竖井定向测量的技术方案,为今后类似工程提供了科学依据。In the paper, the shield-driven tunneling technique used in Honghuatao pipeline crossing in Yangtze River for West-to-East Gas Transmission Pipeline Project is introduced. In the light of this technique ' s characteristics,the analysis on the survey pass-through error is made. According to the comparison results of different survey programs, the tying triangle directional survey program is presented to directionally survey the vertical shaft and is successfully applied to this pipeline project.

关 键 词:管道穿越 盾构法隧道施工 定向测量 应用 盾构法施工 隧道工程施工 施工工艺 泥水加压 隧道施工 误差分析 

分 类 号:U455.43[建筑科学—桥梁与隧道工程] TD175.3[交通运输工程—道路与铁道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象