检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]Institute of Computer Science,Harbin Engineering University, Harbin 150001,Wuhan Digital Engineering Institute,Wuhan 430074 [2]Wuhan Digital Engineering Institute,Wuhan 430074 [3]Center of Software Engineering,Three Gorges University,Yichang 443002
出 处:《Journal of Donghua University(English Edition)》2005年第3期23-27,共5页东华大学学报(英文版)
摘 要:A checkpointing scheme for relevant distributed real-time tasks which can be scheduled as a DAG is proposed. A typical algorithm, OSA, is selected for DAG scheduling. A new methods based a new structure, Scheduled Cluster Tree, is presented to calculate the slack time of each task in the task cluster. In the checkpointing scheme, the optimal checkpoint intervals which minimize the approximated failure probability are derived formally and validated experimentally. The complexity of approximated failure probability is quite small compared with that of the exact probability. Meanwhile, the consistency of the checkpointing is discussed also.A checkpointing scheme for relevant distributed real-time tasks which can be scheduled as a DAG is proposed. A typical algorithm, OSA, is selected for DAG scheduling. A new methods based a new structure, Scheduled Cluster Tree, is presented to calculate the slack time of each task in the task cluster. In the checkpointing scheme, the optimal checkpoint intervals which minimize the approximated failure probability are derived formally and validated experimentally. The complexity of approximated failure probability is quite small compared with that of the exact probability. Meanwhile, the consistency of the checkpionting is discussed also.
关 键 词:CHECKPOINT task scheduling DAG scheduled clusters tree
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.147