检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]同济大学土木工程学院地下建筑与工程系,上海200092
出 处:《岩土工程学报》2006年第1期42-47,共6页Chinese Journal of Geotechnical Engineering
基 金:国家自然科学基金资助项目(50279032);教育部新世纪人才支持计划资助项目
摘 要:通过对上海M4线张扬路至浦电路区间隧道近距离下穿越已运营M2线工程施工过程的监测,分析对比了盾构两次近距离下穿越施工的过程和特点,讨论了M2线周围地层土体的沉降变形和规律。同时,针对盾构近距离穿越施工技术难题,较系统探讨了近距离下穿越施工技术方案,分析了施工技术控制要领,为今后类似工程提供了借鉴。Shield tunneling has become a main construction method used for underground engineering, especially within weak soil and congested urban areas. With more and more built-up underground projects, it will be often faced with many engineering problems about crossing construction no matter what improvement is made in the tunnel shielding technology. The influence of tunnel shield crossing through an adjacent operating metro was paid much attention by lots of researchers at home and abroad now. A great deal of in-situ monitoring data observed from a case named Zhangyang to Pudian Tunnel No.2 of Shanghai was analyzed and studied. Its conclusion would be helpful for the future similar shield tunneling projects.
分 类 号:U455.43[建筑科学—桥梁与隧道工程] U459.3[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.200