金马大桥主梁横隔梁受力分析与预应力施工技术  被引量:8

Prestressed Construction Technology and Stress Analysis of Diaphragm in Jinma Bridge

在线阅读下载全文

作  者:余报楚[1] 张哲[1] 张洪金[1] 

机构地区:[1]大连理工大学桥梁工程研究所,辽宁大连116024

出  处:《公路交通科技》2006年第1期82-85,共4页Journal of Highway and Transportation Research and Development

摘  要:金马大桥的桥面板、边主梁以及横隔梁分阶段一次浇注有别于传统的施工方法,可能会导致横隔梁中的预应力储备过于偏小和边主梁外侧可能因为变形过大而使应力超标,进而产生裂缝。文章通过有限元计算分析证明其横隔梁应力储备合理,边主梁不会产生裂缝,施工方法合理。此外对横隔梁预应力筋的张拉顺序进行了施工阶段分析和研究,得出分批张拉预应力筋会使两道横隔梁中的应力更均匀合理的结论,对同类型工程具有一定的参考价值。The construction of the bridge deck, longitudinal edge-beam, and the diaphragm at same time of jinma bridge maybe resulted in some questioning as follows the prestress force in the diaphragm was beheved too low and result in cracking in the side-face of the main girder. This paper verifies the satisfactory adequacy of the prestress force in the diaphragm by FEM Analysis and the questions can be totally eliminated in terms of side-face cracking in the main girder. Furthermore, the prestress procedures in the diaphragm are studied by loading cases. A conclusion can be drown being that a uniform and reasonable stress distribution in the diaphragm may be presented through the multi-stage prestress. The construction of Jinma Bridge provides an effective reference and basis for the main girder prestress construction of future similar large-span cable-stayed bridges.

关 键 词:斜拉桥 边主梁 横隔梁 预应力筋束 分批张拉 一次张拉 

分 类 号:U448.232[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象