检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《武汉理工大学学报》2006年第2期38-41,共4页Journal of Wuhan University of Technology
基 金:教育部博士点基金(20030491004);国家自然科学基金(40072084)
摘 要:分析了三峡库区滑坡治理中抗滑桩锚固深度一般取桩长的1/2~1/3存在的问题。用弹性地基系数法,计算了弹性桩作用于桩侧岩土体的应力。滑动面为倾斜面时,对桩前岩体中存在的不利结构面进行抗滑稳定性验算,得出抗滑桩的最小锚固深度,提出了根据桩周岩土体的性质来确定桩侧岩土体的横向容许承载力。工程实例表明:桩的锚固深度的确定可以依据桩的不同结构形式,稳定地层的强度,滑坡推力,桩的刚度,桩的截面和间距及是否考虑桩前滑体的抗力等因素综合确定。The technique anti-piles was an effective measure in landslide control works, which nowadays had wide applica- tion in the fields of geo-hazard control in the reservoir area of Three Gorges Project in China. Usually, the pile's anchorage length was 1/2-- 1/3 of the pile' s length. This paper analyzed existent problems on anti-sllde pile' s anchorage length as the experience. By elastic foundation coefficient method, this paper calculated lateral stress that elastic pile acts on surrounding rock soil. Rock's transverseallowable bearing value is classified and confimled according to its engineering geological characters. When the sliding surface was gradient not even, the minimum anchorage length is given by checking the safety against sliding of adverse structural unit in the rock. A case of project showed that anchorage length of anti-slide pile was confirmed synthetically by some factors, such as pile's different structural form, strength of stabilized stratum, landslide thrust, pile's bending rigidi- ty, section and space between piles,and slice resist force before piles.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.21.241.17