检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:吴波[1,2] 刘维宁[1] 索晓明[3] 史玉新[3]
机构地区:[1]北京交通大学土建学院 [2]铁道第三勘察设计院,天津300142 [3]铁道第三勘察设计院
出 处:《探矿工程(岩土钻掘工程)》2006年第2期57-62,共6页Exploration Engineering:Rock & Soil Drilling and Tunneling
基 金:北京市科技计划重点项目(D0604003000011)
摘 要:结合北京地铁10号线国贸站转弯段施工对邻近桥基影响的这一实际工程问题,运用ABAQUS软件,在对施工过程进行动态模拟的同时,重点研究了施工过程中19-3号桥基的变形和受力性态以及桩土相互作用机理,并将部分计算结果与量测结果进行了比较,取得了一系列的成果。研究表明,施工期间桥基没有工程安全隐患,既有的施工方案是合理可行的。Combined with the Guomao Subway Station on Beijing metro line 10, by means of ABAQUS software, construction process and construction effect on adjacent 19 - 3 pile foundation of Guomao Bridge are simulated and the deformation and force character of pile foundation as well as the interaction mechanism of pile-soil are studied. The partial results acquired by simulation and measure are consistent by compare and a mass of harvest is achieved. The conclusions are reached that 19 -3 pile foundation of Guomao Bridge is safe during construction and existing construction project is reliable. The basis and guidance are provided for succedent Guomao Metro Station and similar engineering construction.
关 键 词:城市地铁施工 转弯段 桩-土相互作用 ABAQUS
分 类 号:U455[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.53