检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]黑龙江科技学院机械工程学院,哈尔滨150027
出 处:《黑龙江科技学院学报》2006年第2期88-91,共4页Journal of Heilongjiang Institute of Science and Technology
基 金:教育部科学技术研究重点项目(206045)
摘 要:根据采煤工作面设备配套条件和采煤机工作循环特点,分析了记忆程控滚筒调高的采样、控制环节误差产生的原因,论述了可靠预测采样控制的精度及误差的修正,以再现上一截割循环顶底板的变化序列曲线。通过对正弦函数型的参考序列曲线和比较序列曲线关联度计算分析,研究了灰预测关联度的几种方法特征,给出了适合采煤机滚筒记忆程控特点的关联度预测方法,满足记忆程控的指令宏观再现控制要求。The paper discusses sampling precise prediction and error correcting of drum lifting by memory program controlling, computation and analysis of the correlation degree of the reference sequence curve and the comparison of sequence curve by practice examples of sine function. The paper offers the study of several methods and the prediction of the character of the grey prediction correlation degree, combination of characteristic and demands of drum memory program control for shearers pursuing macroscopical and holistic following capacity, choice of the fit prediction methods of correlation degree. This method features practicability.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145