龙滩升船机中间渠道通航条件试验  被引量:10

Study on navigable condition in the intermediate channel between the two ship lifts of Longtan Power Station

在线阅读下载全文

作  者:李焱[1] 郑宝友[1] 于宝海[1] 迟杰[1] 

机构地区:[1]交通部天津水运工程科学研究所,天津300456

出  处:《水道港口》2006年第2期89-94,共6页Journal of Waterway and Harbor

基  金:西部交通建设科技项目(200432822436)

摘  要:通过对龙滩水电枢纽两级升船机中间渠道内航行条件的水工模型试验研究,结果表明:中间渠道内船舶(队)单向航行速度小于2.0 m/s时,船行波、航行阻力和船体下沉量均不大;中间渠道直线段宽为32 m时,宜采用航、停的会让方式,航速应<1.5 m/s,而船舶宜停泊在右航线上;船舶(队)转弯时的航迹带要宽,因此不应有转弯段等航速会船。From hydraulic model test on navigable condition in the intermediate channel between the two ship lifts of Longtan Power Station, it's shown that the ship wave, ship sinkage and ship sailing resistance is not large, when the sailing velocity in one way is less than 2.0 m/s. When the intermediate channel is 32 m wide, one ship should be halted on the fight sailing line if another ship is passing by and the sailing velocity should be less than 1.5 m/s. The width of sailing track is large in the incurvate channel, so ships should not pass by each other with constant sailing velocity in this part.

关 键 词:龙滩水电枢纽 升船机 中间渠道 通航条件 

分 类 号:U641.1[交通运输工程—船舶及航道工程] U642[交通运输工程—船舶与海洋工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象