检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王晓煜[1]
出 处:《沈阳工业大学学报》2006年第2期214-217,共4页Journal of Shenyang University of Technology
摘 要:车间作业调度问题是最困难的组合优化问题之一,也是计算机集成制造系统中的一个关键环节,在实际生产中广泛应用.根据工厂车间生产模式给出了基于工序模式的编码设计方式,并基于这种编码方式对车间作业调度的成本模型做了优化.该模型是一个在时间、可重复使用和不可重复使用资源约束下的多模式车间作业调度问题,加入了不同工序在不同模式下的最小延迟,从而使基于该模型的车间作业调度问题能够达到时间-成本双优的效果.Job-shop Scheduling Problem (JSP) is one of the hardest combinatorial optimization problems and a pivotal link in CIMS. It is wildly applied to practical production. A code design mode based on the process pattern was proposed according to factory workshop production mode, and a cost optimization model was built based on this mode for JSP. The model is a multi-mode JSP subject to the constraints of time, renewable resources and nonrenewable resources. By including the minimum delays of different process under different pattern, dual time-cost optimization can be achieved.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28