检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:洪景丰[1]
出 处:《核动力工程》1996年第3期193-198,共6页Nuclear Power Engineering
摘 要:地概述了核电厂结构、系统和部件的地震分析全过程,包括厂址地震载荷的确定,分析系统的划分,数学模型建立,计算方法和结果的分析、处理等.对其中主要环节作了比较详细的评述.此外,简要介绍了地震载荷与其它载荷的组合。All aspect of seismic analysis for structures,systems and components in NPP is out lined and oveviewed.The selection and determination of seismic load at the site of NPP as input of seismic analysis,partitioning of main system and subsystem for analysis,developing of mathematic model,computating methods and analysis and treatment of results obtained are presented.For some essential and important steps,more detailed interporation are giv en.Also the combination of earthquake and other loads e.q.dead weight,temperature,pressure and postulated LOCA etc.have been introduced in the paper.
分 类 号:TM623[电气工程—电力系统及自动化] TU311.3[建筑科学—结构工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15