浅埋回填土隧道开挖的拱顶和地表沉降控制探讨  被引量:5

Inquiring into Vault and Surface Subsidence Control in Excavation of Tunnel with Shallowly-buried Back Filling Soil

在线阅读下载全文

作  者:何刚[1] 杨金虎[1] 陈庆[1] 

机构地区:[1]煤炭科学研究总院重庆分院,重庆400037

出  处:《矿业安全与环保》2006年第B06期105-107,110,共4页Mining Safety & Environmental Protection

摘  要:通过监控量测预测了隧道冒顶和塌方,采用地面压浆和旋喷桩对隧道围岩进行改良固结处理后,洞内变形得到有效控制,而地面变形仍然较大。在注浆过程中,未垮塌段注浆引起的地面沉降比垮塌段小,而掘进过程中,未垮塌段掘进引起的地面沉降比垮塌段大。The roof fall and landslide of the tunnel was predicted through monitoring and measurement, the consolidation treatment for the surrounding rock of the tunnel was conducted by surface forcing grouting and rotary shotcrete pile, the deformation in the tunnel was effectively controlled, but the surface deformation above the tunnel is still larger. In the process of grouting, the surface subsidence caused by the grouting in the section which not caved is smaller than that in the caved section, but in the drivage process, the surface subsidence caused by the drivage in the section which not caved is larger than that in the caved section.

关 键 词:浅埋隧道 回填土 监控量测 沉降控制 压浆处理 旋喷桩 

分 类 号:TD325.4[矿业工程—矿井建设]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象