检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]浙江大学城市学院土木工程系,杭州310015
出 处:《岩土力学》2006年第7期1129-1132,共4页Rock and Soil Mechanics
摘 要:对水平平行双线顶管之间的相互作用进行了分析,提出了横向扰动区范围的计算公式。考虑先施工顶管对后施工顶管的影响,提出了一种新的后施工顶管地面沉降计算方法,并给出算例分析。分析表明,水平平行顶管施工时由于中间区域受到双重扰动,会产生较大的地面沉降。当两顶管轴线距离较近时,由于先施工顶管对周围土体产生的扰动会使后施工顶管产生的扰动加剧,后施工顶管引起的最大地面沉降值和沉降槽宽度都要变大,且地面沉降曲线是不对称的,其最大沉降点要偏向先施工顶管侧,但仍然可以采用Peck公式进行计算。The interaction of two level parallel pipe jacking is analyzed; and the calculation of lateral disturbance scope is advanced. Considering the effeets of former pipe jacking on the latter, a new calculational method for ground settlement of latter pipe jacking is put forward with an analytical calculation example. It is shown that the ground settlement produced by middle zone is greater because of double disturbance during parallel pipe jacking construction. Also, the surrounding soil disturbance due to former pipe jacking construction will strengthen the disturbance during latter pipe jacking construction when the axes of two pipe jacking are in close quarters. Thus, the maximum ground settlement and width of settlement trough during latter pipe jacking construction become greater. In addition, curves of ground settlement are dissymmetric for latter pipe jacking and can still be calculated with Peek formula. The maximum settlement point On curves leans towards the side of former pipe jacking.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.217.162.18