盾构隧道施工泥浆处理过程数据计算方法探讨  被引量:6

Discussions on Calculation Method for Slurry Treatment Data in Shield Tunnel Construction

在线阅读下载全文

作  者:卢智强[1] 曾垂刚 

机构地区:[1]中铁隧道集团有限公司,河南洛阳471009 [2]武汉长江隧道股份公司项目部,武汉430062

出  处:《隧道建设》2006年第4期1-2,36,共3页Tunnel Construction

摘  要:泥水处理是泥水盾构施工中非常关键的工序。如何在施工前期,甚至在投标阶段,利用地质参数确定泥浆处理系统过程数据,进而测算施工中所发生的费用十分关键。结合武汉长江隧道的泥水处理设备和地质情况,对盾构隧道泥水处理过程数据的计算方法进行探讨。Slurry treatment is one of the most fundamental aspects ot tunnel construction by means of slurry shield machine. In the early stage of the construction, even in the bidding stage, therefore, it is of great improtance to determine the process data of the slurry treatment system on basis of the geological parameters, through which the cost to be incurred during the construction will be estimated. On basis of the experience related to the slurry treatment facilities and geological conditions of Wuhan Yangtze River crossing tunnel, the paper discusses on the process data calculation method of the slurry treatment system in shield tunnel construction.

关 键 词:盾构隧道 泥浆处理 计算方法 

分 类 号:U455.43[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象