检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《制冷学报》2006年第4期37-40,共4页Journal of Refrigeration
摘 要:空气源热泵机组在冬季运行时,由于机组需要不断除霜,将导致机组供热能力不足、室内吹冷风、房间热舒适性下降等问题出现。为此,提出了一种利用相变蓄热技术解决空气源热泵机组冬季除霜问题的新途径。其基本原理是,将笔者研制的填充了DX40相变材料板的新型蓄热装置与空气源热泵机组相连接,当热泵机组在制热工况运行时,热泵机组向空调系统供热的同时也向相变蓄热装置蓄热;当热泵机组转换至除霜工况运行时,相变蓄热装置向空调房间放热,在提高房间热舒适性的同时,缩短热泵机组除霜时间,提高机组工作效率。试验结果表明,该相变蓄热装置应用于空气源热泵机组冬季除霜性能的优良性。Frost removing of air- source heat pump results in shortage of heat output, chilly air flow, and less comfortable interior environment in winter. In our study, a new method to solve the problem of frost- removing in air- source heat pump units was proposed using phase- change energy storage technique. The thermal storage equipment filled with DX40 phase- change material was connected to the air- source heat pump unit. In heating cycle, the heat pump unit provides heat to both indoor air and the phase- change heat storage equipment. In frost- removing cycle, the thermal storage equipment provides heat to indoor air in order to make the room comfortable, the frost - removing quicker, and the unit more efficient. The experimental results show that the air- source heat pump connected with the phase- change thermal storage equipment performs well.
关 键 词:工程热物理 空气源热泵机组 冬季除霜 相变蓄热 热量补偿
分 类 号:TU831[建筑科学—供热、供燃气、通风及空调工程] TS261.8[轻工技术与工程—发酵工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.222.132.108