复合地层中盾构滚刀磨损原因分析及对策  被引量:82

Analysis of the abrasion of disc cutters of shields in composite ground and countermeasures

在线阅读下载全文

作  者:竺维彬[1] 王晖[1] 鞠世健[1] 

机构地区:[1]广州市地下铁道总公司,广州510380

出  处:《现代隧道技术》2006年第4期72-76,82,共6页Modern Tunnelling Technology

摘  要:通过系统地总结和分析约40台次混合式盾构机在复合地层中掘进近100 km的滚刀磨损情况,对滚刀磨损做了定性分类,并根据滚刀磨损的影响因素,提出滚刀磨损的对策,以期指导今后复合地层施工中盾构机刀盘刀具选择、配置及盾构掘进。On the basis of boring about 100 Km tunnels with about 40 mix - shield drives in composite ground, this paper summarizes and analyzes the abrasion of disc cutters, postulates the qualitative classification of abrasion and puts forward the countermeasures to the abrasion according to the factors affecting it, in the hope of giving a guide to choose and install the disc cutters and cutter heads as well as to control the shield driving under this kind of ground condition.

关 键 词:复合地层 盾构 滚刀磨损 原因分析 对策 

分 类 号:U455.39[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象