忻州500kV变电站投运对山西中北部电网的影响  

Influence of Operation of Xinzhou 500 kV Substation on North and Central Part of Shanxi Power Grid

在线阅读下载全文

作  者:侯春青[1] 田翰臻[1] 郑慧萍[1] 杨晓茹[1] 

机构地区:[1]山西电力科学研究院,山西太原030001

出  处:《华北电力技术》2006年第8期1-4,11,共5页North China Electric Power

摘  要:针对山西电网忻州500 kV变电站投产后的具体情况,重点研究了忻州500 kV变电站投产后山西中北部各种500 kV及200 kV电磁环网的运行方式,通过潮流计算、稳定校核等手段,预测了山西中北部500 kV及220 kV电网采取不同运行方式对山西电网的影响,指出了各种运行方式的优缺点,并结合山西电网的具体情况提出了有针对性的稳定控制措施。According to the concrete condition of Shanxi power grid at the initial construction stage of 500 kV Xinzhou substation,the parallel operation of 500 kV and 220 kV power networks in north and central part of Shanxi power grid after operation of Xinzhou substation is emphatically researched. By means of the analysis of power flow calculation ,stability verification etc ,the impact of different parallel operation modes of 500 kV and 220 kV power networks in north and central part of Shanxi power grid on whole power gird is predicted. The merits and demerits of these operation modes are pointed out, considering the concrete situation of Shanxi power grid,the way of stability control to be adopted is proposed.

关 键 词:电力系统 潮流计算 稳定控制 

分 类 号:TM63[电气工程—电力系统及自动化] TM712

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象