机构地区:[1]中南大学土木建筑学院,长沙410075 [2]中南水电勘测设计研究院,长沙410014
出 处:《工程地质学报》2006年第4期481-487,共7页Journal of Engineering Geology
摘 要:基于弹塑性有限元(FEM)模型和Mohr—Coulomb屈服准则,采用平面有限元法对龙滩水电站航道1+016~1+080开挖边坡座滑前的稳定状况进行了数值模拟研究。对座滑前边坡的应力场、位移场及塑性屈服区的模拟结果表明,边坡在座滑前存在明显的塑性区,处于临界稳定状态;开挖过程中边坡存在连续变形,特别是开挖下部时变形会突然增大;座滑前边坡塑性区支护体系已达到承载极限,边坡具备了座滑的条件。Based on the elasto - plastic model and Mohr - Coulomb yielding criterion, a 2D finite element method (FEM) is applied to conduct numerical simulation of excavated sliding cut slope on the navigation route 1 +016 ~ 1 + 080 of Longtan Hydropower Station. The calculated result are presented for the stress field, displacement field and plastic yielding area before the slope slid. The results show that there was an apparent plastic area at sliding cut slope which was in a state of critical instability. There was continuous deformation in the slope during excavation. Especially the deformation suddenly expanded when lower part of the slope was being excavated. The supporting system in the plastic area ahead of the landslide had reached its limit bearing capacity. The cut slope was ready to fail suddenly and quickly.
分 类 号:U416.14[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28