检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:马莉[1] 李英[1] 刘毓全 雷晓蒙[2] 何秋良[2]
机构地区:[1]国网北京经济技术研究院,北京100761 [2]中国长江电力股份有限公司,北京100032
出 处:《电力技术经济》2006年第4期11-14,共4页Electric Power Technologic Economics
摘 要:结合水电的特性,分析了水电参与市场竞争面临的主要问题,深入探讨了各类水电站参与的市场类型,梯级水电站的报价主体、上下游水电站中标电量不协调如何处理、水电站未中标弃水时和由于预测不准而产生电量偏差的处理等。The main problems facing hydropower station in power market bidding are analyzed taking into consideration of the hydropower properties. Further discussion is carried out on the type of power market participated by various hydropower stations, the main bidding system for cascade hydropower stations, settlement of uncoordinated tendered electricity between upstream hydropower stations and downstream stations, and handling of water discharge of hydropower station in case of bidding failure or electricity deviation due to incorrecmess of forecast.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3