检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]东北大学资源与土木工程学院,辽宁沈阳110004 [2]沈阳建筑大学土木工程学院,辽宁沈阳110168
出 处:《重庆大学学报(自然科学版)》2006年第7期149-151,共3页Journal of Chongqing University
基 金:交通部重点科技攻关项目(2002-3533207)
摘 要:结合沈大高速公路改扩建工程金州单洞四车道公路隧道施工现场监测,对大跨度隧道开挖岩体变形的规律进行了探讨,揭示了大跨度隧道开挖后围岩失稳的原因,强调进行现场稳定性监测的必要性,阐明了锚喷网支护对于改善围岩受力状况、提高围岩自身承载力的本质,指出在大跨度公路隧道施工中必须坚持监控量测与主动控制的原则,以确保隧道施工的安全和质量.According to the measurement during excavation of Jinzhou tunnel with four lanes in one cave which lies on the rebuilt highway from Shenyang to Dalian, this paper analyzes the rock deformation rule, discusses the reason of instability after a highway tunnel was excavated, emphasizes the necessity of the construction stability monitor and active control. The importance of support is Fresented with bolts and shotcrete to improve and enhance the carrying capability of the rock. It is necessary to insist on the rule of measurement and active control to ensure the safety and quality of tunnel construction.
关 键 词:四车道隧道 隧道开挖 岩体变形 稳定监测 主动控制
分 类 号:TD854.2[矿业工程—金属矿开采]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.157