黄河小浪底调水调沙问题的SAS回归模型  被引量:4

SAS linear regression model on the Yellow River's man-made floods and sand drainage in Xiaolangdi

在线阅读下载全文

作  者:邱学绍[1] 职桂珍[1] 冯延伟[1] 

机构地区:[1]郑州轻工业学院信息与计算科学系,河南郑州450002

出  处:《郑州轻工业学院学报(自然科学版)》2006年第3期94-96,共3页Journal of Zhengzhou University of Light Industry:Natural Science

基  金:河南省自然科学基金项目(0511010100);郑州轻工业学院科研基金项目(2004012)

摘  要:为了确定排沙量与时间、排沙量与水流量的函数关系,采用SAS软件做线性回归得到排沙量与时间的函数关系式,再利用所求函数在区间[0,24]上进行积分得到总排沙量为1.93962亿吨.对于排沙量与水流量之间的关系,按时间分为两段进行拟合,最终确定了排沙量与水流量的函数关系.In order to-find out the function relationship between sand discharge capacity and time, and the relation between sand discharge capacity and tonnage, SAS program is applied to make linear regression and find the function equation of the former relationship, Then by integrating the function acquired on the intervals [0, 24], the total sand discharge capacity is obtained, by fitting in the two phases of time, the function gained in the end. that is 193.962 million tons. As for the latter relationship, expressions of the sand discharge capacity and tonnage is

关 键 词:调水调沙试验 SAS 排沙量 水流量 线性回归 

分 类 号:O24[理学—计算数学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象